Opportunities / JUSTICE, DEPARTMENT OF

MDC BROOKLYN - REMOVE AND REPLACE SHOWER PARTITIONS

Notice typeCombined Synopsis/Solicitation
Solicitation #15BBR027Q00000003
DepartmentJUSTICE, DEPARTMENT OF
Sub-tier / officeFEDERAL PRISON SYSTEM / BUREAU OF PRISONS / MDC BROOKLYN
NAICS332913 — Plumbing Fixture Fitting and Trim Manufacturing
PSC4510
Set-asideSmall Business (total)
PostedOct 20, 2026
Response deadlineNov 13, 2026 (2026-11-13T12:00:00-05:00)
Place of performanceBrooklyn, NY, 11232
Primary contactBRIAN RODRIGUEZ · b2rodriguez@bop.gov · 7188404130

Description (excerpt)

This is a combined synopsis/solicitation for commercial construction for MDC Brooklyn located at 80 29th Street Brooklyn, NY, 11232, and is prepared in accordance with the format in subpart FAR Revision Subpart 12.202(b)(1), as supplemented with additional information included in this notice. This announcement constitutes as the only solicitation; quotes are being requested and a written solicitation is issued (see attached). You are required to provide all pages of the written attached solicitation with your complete quotation. The Federal Bureau of Prisons (BOP) anticipates issuance of solicitation 15BBR027Q00000003 for the award of a firm fixed-price construction contract titled REMOVE AND REPLACE SHOWER PARTITIONS at the Metropolitan Detention Center in Brooklyn, NY. MDC Brooklyn is a federal correctional facility located at 80 29th Street Brooklyn, NY 11232. The contractor is responsible to provide all equipment and labor to remove and replace all existing shower partitions (with attached changing rooms) and bathroom stall partitions on the 2nd, 3rd, 4th, 5th, and 6th floors of the East Building at MDC Brooklyn. Each floor contains a North and South side, and each side includes: 6-bathroom stalls 7- shower stalls with changing rooms Changing rooms shall be 39.5 inches deep and include a door All partitions shall be floor- and overhead braced. Materials and finishes shall include: Powder-coated steel partitions 58-inch doors and panels Chrome zamac hardware Silver Vein color for all doors and panels Contractor shall also remove and replace all affected existing restroom accessories including, but not limited to, handicap grab bars, toilet paper holders, sanitary napkin dispenser, towel bars, soap dispensers, etc. Contractor to provide industrial standard labor and materials warranties from date of substantial completion. See the Statement of Work (SOW) attachment. The performance period for the project will be 60 calendar days from issuance of the notice to proceed. The timeframe allotted will allow adequate time for security clearances to be obtained, materials to be ordered and delivered on site, the removal of the old equipment, the work to be completed, system testing to be completed, and demobilization from the work site. Pursuant to Federal Acquisition Regulation 36.204, the estimated magnitude of the project lies between $100,000 and $250,000. (NOTE: This range is one of 8 available ranges from FAR 36.204 and is not meant to imply that the proje …

View the official notice on SAM.gov →