Opportunities / DEPT OF DEFENSE

Jacksonville Harbor Maintenance Dredging

Notice typePresolicitation
Solicitation #W912PM27BA003
DepartmentDEPT OF DEFENSE
Sub-tier / officeDEPT OF THE ARMY / W074 ENDIST WILMINGTON
NAICS237990 — Other Heavy and Civil Engineering Construction
PSCZ1KF
Set-asideNone
PostedOct 16, 2026
Response deadlineDec 31, 2026 (2026-12-31T15:00:00-05:00)
Place of performance32202
Primary contactRosalind Shoemaker · rosalind.m.shoemaker@usace.army.mil · 9102514436

Description (excerpt)

The U.S. Army Corps of Engineers, Enterprise Dredge Delivery Center (EDDC) requires a contract to provide maintenance dredging for Jacksonville Harbor. Jacksonville Harbor: The Jacksonville Harbor, FL - FY27 O and M Contract (non-fed sponsor Jacksonville Port Authority (JAXPORT)) for maintenance dredging typically requires hopper and pipeline/mechanical dredge(s) depending on work location in the~ 20-mile federal channel. The dredge(s) must have the capability to dredge maintenance material up to a depth of -47 ft MLLW (w/additional depths for required advanced maintenance areas and allowable over depths) and to transport the dredged sediment to both a designated Dredged Material Placement Area (DMPA) known as Bartram Island and the Ocean Dredge Material Disposal Site (ODMDS) located approximately 6 nautical miles offshore. Dredged material shall be placed upland in Bartram Island Cell F and the Jacksonville ODMDS Release Zone C1 depending on the specific reach to be dredged. The transport distance to the designated placement areas varies significantly, ranging from direct, local placement to a few miles for the upland placement area and up to 6 miles for ocean disposal from the tip of the south jetty. The work is divided into a base and five options. The Contractor shall be required to (a) commence work under this contract within ten (10) calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 220 days after the Contractor receives the notice to proceed. The time stated for completion shall include final cleanup of the premises. Base: 120 calendar days. Option A: 15 calendar days. Option B: 20 calendar days. Option C: 30 calendar days. Option D: 25 calendar days. Option E: 10 calendar days. Complete all work within Cut-17 Sta. 0+00 through Cut-41 Sta. 20+00 (BASE work), which are located within an Outstanding Florida Waters (OFW), no later than May 20, 2027.This solicitation is unrestricted. The contract issued will be Firm Fixed Price. This solicitation will be issued in electronic format only and will be available on or about 02 November 2026. The bid opening date will be specified in the solicitation when it is issued. No additional media (CD-ROM, floppy disks, facsimiles, etc.) will be provided. Paper copies of this solicitation will not be available. Other methods of requesting a package will not be honored. The North American Industry …

View the official notice on SAM.gov →