Opportunities / GENERAL SERVICES ADMINISTRATION

Construction Services for the Gate 7 Parking Garage St. Elizabeths West Campus

Notice typeSolicitation
Solicitation #47PB5126R0038
DepartmentGENERAL SERVICES ADMINISTRATION
Sub-tier / officePUBLIC BUILDINGS SERVICE / PBS PROJECT DELIVERY CAPITAL CONSTRUCTION - BRANCH NORTHEAST
NAICS236220 — Commercial and Institutional Building Construction
PSCY1AZ
Set-asideNone
PostedOct 22, 2026
Response deadlineNov 9, 2026 (2026-11-09T16:00:00-05:00)
Place of performanceWashington, DC, 20032
Primary contactJennifer Silkensen · jennifer.silkensen@gsa.gov · 215-446-5099

Description (excerpt)

Amendment 0002 is hereby posted. ________________________________________________________________________ Amendment 0001 is hereby posted. ________________________________________________________________________ The General Services Administration (GSA), Public Buildings Service (PBS), is seeking a qualified contractor for construction services for the Gate 7 Parking Garage at the St. Elizabeths West Campus in Southeast Washington, DC. GSA anticipates awarding a single Firm-Fixed-Price construction contract for the new construction of the Gate 7 Parking Garage and associated site, utility, security, stormwater, landscape, and infrastructure improvements. The project will support the operational needs of the U.S. Department of Homeland Security (DHS) at the St. Elizabeths West Campus. This acquisition is for construction services only. The project design is being completed separately by GSA’s Architect of Record, ZGF. The construction solicitation is based on Issued for Construction drawings, specifications, and related contract documents. The work to be performed under the terms of this contract includes, but is not limited to, furnishing all management, supervision, subcontractors, labor, materials, supplies, tools, equipment, coordination, quality control, testing, inspections, commissioning support, and closeout documentation necessary to construct the Gate 7 Parking Garage in accordance with the contract documents. The project includes construction of a new multi-level parking garage with associated surface parking, access and screening infrastructure, and related campus improvements. The anticipated scope includes, but is not limited to: Site development, clearing, grading, excavation, and civil infrastructure improvements Utility relocations, extensions, tie-ins, and connections Substructure construction, including foundations, slab-on-grade, excavation support, waterproofing, and retaining walls Parking garage structure, including structural framing, parking decks, ramps, stairs, elevators, roof assemblies, and related structural components Mechanically ventilated parking garage systems, including ventilation equipment, shafts, ductwork, louvers or openings, controls, electrical power, life-safety interfaces, testing, balancing, and commissioning support Exterior façade and building envelope construction, including a classical architectural brick façade with openings Exterior doors, windows, louvers, waterproofing, sealants, flashings, and related e …

View the official notice on SAM.gov →