Opportunities / TRANSPORTATION, DEPARTMENT OF
Remedial Action (RA) activities at the Kahuku Point Former Radio Range site
| Notice type | Presolicitation |
|---|---|
| Solicitation # | 697DCK-27-R-00036 |
| Department | TRANSPORTATION, DEPARTMENT OF |
| Sub-tier / office | FEDERAL AVIATION ADMINISTRATION / 697DCK REGIONAL ACQUISITIONS SVCS |
| NAICS | 562910 — Remediation Services |
| PSC | F108 |
| Set-aside | Small Business (total) |
| Posted | Oct 26, 2026 |
| Response deadline | Nov 5, 2026 (2026-11-05T15:00:00-06:00) |
| Place of performance | Kahuku, HI |
| Primary contact | Sonia Holguin · sonia.o.holguin@faa.gov · 8172224397 |
Description (excerpt)
The Federal Aviation Administration (FAA) contemplates issuing a Screening Information Request (SIR) for Remedial Action (RA) activities at the Kahuku Point Former Radio Range site (Site), located on the North Shore of Oahu, Hawaii. Activities include excavating 3,768 tons of soil contaminated with lead and polychlorinated biphenyls (PCBs) and disposing of the soil offsite according to applicable regulations. The purpose of this pre-solicitation is to solicit statements of interest and capabilities from Small Business Administration (SBA) small business concerns capable of performing the type of work described in this notice. The Contractor will provide all equipment, supplies, labor, transportation, and supervision necessary to perform the tasks described in the scope of work (SOW), not attached. The SOW includes, but is not limited to, the following: - The Contractor must excavate contaminated soil that was identified in reports that will be available at time of solicitation. - The Contractor must arrange for proper storage, transport, and disposal of all investigation-derived waste (IDW) generated from this RA, including necessary sampling for proper disposal. Backfilling of the excavated area will not be required. - Excavation, hauling, and disposal, quantities are as follows: Area to be excavated: 3.2 acres. Average depth of excavation: 1 foot. Average density of excavated soil excavation reports at the site): 0.73 tons per cubic yard. Total tons to be excavated: 3,768 tons. - The Contractor must decommission and remove the five (5) groundwater monitoring wells at the Site. The wells must be decommissioned according to the regulatory requirements of HDOH. The wells are very shallow and will not require the use of a drill rig for removal. - The Contractor must identify all buried utility systems where subsurface work will take place. A request for locate services with the appropriate public utility dig-line for the area must be filed within the required timeline prior to site work. - The Contractor must use GIS to generate the survey coordinates of the perimeters of the DUs to be excavated according to the attached Figure 2. The perimeters of the DUs to be excavated must be located in the field to the horizontal accuracy of 1 foot. - The Contractor is responsible for obtaining all permits and permissions and submitting all notifications required to complete this scope of work. - The Contractor is required to submit pre and post project documentation fo …