Opportunities / DEPT OF DEFENSE
JP Murtha Float Mooring Bitts Retrofit
| Notice type | Solicitation |
|---|---|
| Solicitation # | W911WN27BA001 |
| Department | DEPT OF DEFENSE |
| Sub-tier / office | DEPT OF THE ARMY / W072 ENDIST PITTSBURGH |
| NAICS | 237990 — Other Heavy and Civil Engineering Construction |
| PSC | Z2KA |
| Set-aside | None |
| Posted | Oct 16, 2026 |
| Response deadline | Nov 5, 2026 (2026-11-05T11:00:00-05:00) |
| Place of performance | 15062 |
| Primary contact | Connie Ferguson · connie.l.ferguson@usace.army.mil · 4123957551 |
Description (excerpt)
JP Murtha Float Mooring Bitts Retrofit - The United States Army Corps of Engineers, (USACE) Pittsburgh District has a requirement for the retrofitting of existing hydraulic structures within an active navigation lock. The Prime Contractor must be capable of executing complex in-the-wet construction, specifically: The John P. Murtha Floating Mooring Bitt Retrofit consists of the installation of Government furnished Floating Mooring Bitts into Contractor fabricated embedded frame on the existing River Chamber Middle Wall. In-the-wet construction methods are required. Design, fabrication, and installation of two dewatering boxes are required for installation of the Floating Mooring Bitts. Removal or alterations to existing work in such a manner as to prevent injury or damage to any portions of the existing work which remain. Repair or replace portions of existing work which have been altered during construction operations to match existing or adjoining work, as approved by the Contracting Officer. At the completion of operations, existing work must be in a condition equal to or better than that which existed before new work started. To achieve this Requirement the Contractor must: a. Floating Plant Operations: Providing, operating, and mooring a fully compliant floating plant (crane/deck barge and push boat) in an active river chamber in accordance with EM 385-1-1. b. Dewatering Box (Cofferdam): Fabricating, installing, and sealing structural steel dewatering boxes against lock monoliths for a strict maximum duration of 90 days. c. Heavy Demolition and Concrete Work: Executing concrete wire-sawing, core drilling, and demolition of existing lock wall recesses, followed by cast-in-place concrete integration. d. Structural Steel and Mooring Bitts: Fabricating heavy steel embedded anchorage frames, and salvaging/installing Government-Furnished Floating Mooring Bitts. e. Commercial Diving: Providing certified commercial dive teams to support underwater inspection, rigging, and cofferdam sealing. The work shall be completed within 730 calendar days after written Notice to Proceed. This acquisition will be procured as an Unrestricted Full and Open Solicitation. The resulting award will be for one (1) Firm-Fixed-Price (FFP) Construction Contract. All responsible Bidders are encouraged to participate. The Invitation for Bid (IFB) will be issued on or about 15 September 2026, online through Procurement Integrated Enterprise Environment (PIEE) which posts the opportunit …