Opportunities / AGRICULTURE, DEPARTMENT OF
New Meadows Range Barn
| Notice type | Combined Synopsis/Solicitation |
|---|---|
| Solicitation # | 1240LT27Q0027 |
| Department | AGRICULTURE, DEPARTMENT OF |
| Sub-tier / office | FOREST SERVICE / PAYETTE NATIONAL FOREST |
| NAICS | 237110 — Water and Sewer Line and Related Structures Construction |
| PSC | Z2JZ |
| Set-aside | Small Business (total) |
| Posted | Oct 29, 2026 |
| Response deadline | Nov 29, 2026 (2026-11-28T17:00:00-07:00) |
| Place of performance | ID, 83638 |
| Primary contact | Derrick A Dodson · derrick.dodson@usda.gov |
Description (excerpt)
A. This project consists of modifying an existing waterline and replacing a water hydrant, removing an existing wood deck and constructing a new metal deck, replacing the existing roof, abatement of lead-based paint, removing lead-based paint siding, installing new siding, and preparing and painting exterior surfaces of the New Meadows Range Barn located at the New Meadows Barracks administrative site located at 100 S Norris Ave. New Meadows, ID 83654. B. Base work includes the following described below: 1. Removal of existing roofing, installation of plywood sheathing over the existing skip sheathing, installation of ice/water shield over the entire roof, and installation of new corrugated metal roofing. 2. Abatement of lead-based paint of rafter tails, soffit, & fascia; and painting of aforementioned surfaces. 3. Removal of lead-based paint siding and felt paper, installation of plywood sheathing and building wrap, installation of new siding in-kind, installation of new trim in-kind around the windows, doors, and corners and painting of all aforementioned surfaces. 4. Replacement of approximately 10-feet of existing 1-inch SIDR 9 HDPE waterline including moving the existing hydrant location 2-feet to the east along the side of the building and replacement of the existing hydrant with a new hydrant and drainage basin. Additionally, replacement of an existing galvanized barb fitting with a brass barb fitting is required. C. Optional work includes the following described below: 1. Removal of existing wood decking and foundation piers and fabrication and installation of new expanded metal decking with steps over a metal frame with new foundation piers. D. Quantities associated with these options are identified in the Schedule of Items