Opportunities / DEPT OF DEFENSE

Borough of Millvale, Pennsylvania, Local Protection Project (LPP) PL84-99 Rehabilitation

Notice typePresolicitation
Solicitation #W911WN27QA004
DepartmentDEPT OF DEFENSE
Sub-tier / officeDEPT OF THE ARMY / W072 ENDIST PITTSBURGH
NAICS237990 — Other Heavy and Civil Engineering Construction
PSCY1KZ
Set-asideSmall Business (total)
PostedOct 19, 2026
Response deadlineNov 3, 2026 (2026-11-03T16:30:00-05:00)
Place of performanceMillvale, PA
Primary contactMario TAORMINA · Mario.Taormina@usace.army.mil · 4123957256

Description (excerpt)

This is a Presolicitation Notice only. This is not a Solicitation (Request for Quote). No purchase order will be awarded from this announcement. Any applicable attachments for this project (i.e., Drawings and Specifications) will be issued at the time of the Solicitation. This procurement is a 100% Total Small Business Set-Aside. All interested and capable small business offerors are encouraged to submit a quote. Project Description The Millvale LPP was constructed by U.S. Army Corps of Engineers (USACE) in 1980 under the authority of Section 205 of the Flood Control Act of 1948 as amended. The project consists of about 6,200 feet of channel improvement including concrete gravity retaining walls, concrete wall supports, anchored concrete toe blocks, concrete cap walls, stone-filled gabion mattresses, flap gates and access ramps. The LPP is an urban Flood Control Work (FCW), and it is not a multipurpose project. Heavy rains from 1-12 April 2024 caused flooding which damaged the Project within Girty’s Run, including bank erosion, shoaling, erosion of the improved channel, ruptured gabion baskets, washed-out concrete buttresses, and erosion of grouted riprap. Of particular concern are the washed-out buttresses which have migrated to the center of the improved channel, impeding streamflow. If the buttresses are not removed and stream bank improvements continue to deteriorate, there is a risk that debris will continue to accumulate and could ultimately damage the channel downstream of the impediment. To address these damages, Allegheny County requested rehabilitation assistance from USACE through the PL 84-99 program, which authorizes USACE to rehabilitate eligible Federal and non-Federal LPPs damaged or destroyed by floods. An agreement was signed on 6 August 2025 between the Borough of Millvale and USACE to complete the necessary repairs. Some of the major features of work are, but not limited to: Temporary Stream Diversion, Dewatering, and Environmental Controls Stream Flow Control: Design, furnish, operate, maintain, and remove a temporary stream diversion and bypass pumping system to perform all channel bottom and bank work in a dry, dewatered state. Effluent Filtration: Discharge from pumping systems must pass through approved sediment and debris control filtration before re-entering Girty's Run. E&S Controls: Install, inspect, and maintain erosion and sediment controls compliant with PADEP Publication 363-2134-008. The project is located along Girty’s Ru …

View the official notice on SAM.gov →