Opportunities / DEPT OF DEFENSE
B2210 Upgrade X-Ray Controller
Free · see which open contracts fit your company, with due dates and past-award prices. Sample report →
| Notice type | Presolicitation |
|---|---|
| Solicitation # | C27-003 |
| Department | DEPT OF DEFENSE |
| Sub-tier / office | DEPT OF THE AIR FORCE / FA8125 AFSC PZIMA |
| NAICS | 334515 — Instrument Manufacturing for Measuring and Testing Electricity and Electrical Signals |
| PSC | 6625 |
| Set-aside | None |
| Posted | Oct 29, 2026 |
| Response deadline | Nov 5, 2026 (2026-11-05T10:00:00-06:00) |
| Place of performance | Tinker AFB, OK, 73145 |
| Primary contact | Shana Mandley · shana.mandley@us.af.mil |
🔔 Get notices like this every morning
New matching SAM.gov notices every morning by Telegram or email. No UEI, no password · 14-day Solo trial, no card.
Registered in SAM.gov? Use your UEI for scores based on your award history.
Description (excerpt)
The 76 CMXG is requesting the utilization of funds for the procurement of Upgrade Xray controller and Automated Equipment. In accordance with AIR FORCE T.O 33B-1-2 (Table 3, Master List of Suppo1t Equipment), the system must be an approved equivalent to the X-Ray Apparatus Set (Master/Procmement NSN: MIL-PRF-32133/6635-01-394-5926). The required system must strictly adhere to the following component specifications: SYSTEM SPECIFICATIONS (Upgrade X-ray booth X-ray controller and automated equipment) • Hardware: Includes new servo motors, drives, operator control user interfaces, and manual controls hardware. • Software: Features programmable motion control software based on Parker Motion Systems libraries. It includes an intuitive interface for custom motion programs, automatic inspection positioning for repeatable programs, and digital image capture/save capabilities. • System Integration: The upgraded motion program will operate on the existing Vecow PC, interfacing directly with cmTent imaging software. INSTALLATION, TRAINING AND DOCUMENTATION • Installation & Training: Installation and a minimum of 4 homs of Operator and Maintenance Training onsite. (Covers travel, labor, shipping, and necessaiy bracketing hai·dwai·e to mount/remove equipment in the CMXG TSG X-ray System, with up to two (2) days onsite for installation, testing, debugging, and system acceptance). • Removal and Disposal of the existing equipment. • Documentation: Deliver three (3) complete sets of engineering manuals, which include drawings, schematics, and troubleshooting guides.