Opportunities / DEPT OF DEFENSE
59--CHASSIS,ELECTRICAL-, IN REPAIR/MODIFICATION OF
| Notice type | Presolicitation |
|---|---|
| Solicitation # | N0038326RAA43 |
| Department | DEPT OF DEFENSE |
| Sub-tier / office | DEPT OF THE NAVY / NAVSUP WEAPON SYSTEMS SUPPORT |
| NAICS | — |
| PSC | 5975 |
| Set-aside | None |
| Posted | Aug 28, 2026 |
| Response deadline | Nov 25, 2026 (2026-11-25T14:00:00-04:00) |
| Place of performance | — |
| Primary contact | KRISTEN N. FLORCZAK, N723.09, PHONE (215)697-3770, EMAIL KRISTEN.N.FLORCZAK.CIV@US.NAVY.MIL · KRISTEN.N.FLORCZAK.CIV@US.NAVY.MIL |
Description (excerpt)
NSN 7R-5975-015123483-V2, TDP VER 001, QTY 32 EA, DELIVERY FOB ORIGIN. Repair Turnaround Time (RTAT) definition: The contractual delivery requirement Is measured from asset Return to the date of asset acceptance under the terms of the contract. For purposes of this section, Return is defined as physical receipt of the F-condition asset at the contractor's facility as reflected in the Action Date entry in the Commercial Asset Visibility (CAV) system. In acco rdance with the CAV Statement of Work, the contractor is required to accurately report all transactions by the end of the fifth regular business day after receipt and the Action Date entered in CAV must be dated to reflect the actual date of physical receipt. The Contractor must obtain final inspection and acceptance by the Government for all assets within the RTATs established in this contract. Required RTAT: ## ____ days after receipt of asset Throughput Constraint: Contractor must provide a throughput Constraint for each NSN(s). Total assets to be repaired monthly after initial delivery commences X/month (contractor fill in #). A throughput of ##____ per month reflects no throughput constraint. Induction Expiration Date: 365 days after contract award date. Any asset received after this date in days is not authorized for repair without bi-lateral agreement between the Contractor and NAVSUP WSS Contracting Officer. All contractual documents (i.e. contracts, purchase orders, task orders, delivery orders and modifications) related to the instant procurement are considered to be "issued" by the Government when copies are either deposited in the mail, transmitted by facsimile, or sent by other electronic commerce methods, such as email. The Government's acceptance of the contractor's proposal constitutes bilateral agreement to "issue" contractual documents as detailed herein. Early and incremental deliveries accepted. This part requires engineering source approval by the design control activity in order to maintain the quality of the part. Existing unique design capability, engineering skills, and manufacturing/repair knowledge by the qualified source(s) require acquisition/repair of the part from the approved source(s). The approved source(s) retain data rights,manufacturing/repair knowledge, or technical data that are not economically available to the Government, and the data or knowledge is essential to maintaining the quality of the part. An alternate source must qualify in accordance with the design c …