Opportunities / AGRICULTURE, DEPARTMENT OF

New Meadows Range Barn

Notice typeCombined Synopsis/Solicitation
Solicitation #1240LT27Q0027
DepartmentAGRICULTURE, DEPARTMENT OF
Sub-tier / officeFOREST SERVICE / PAYETTE NATIONAL FOREST
NAICS237110 — Water and Sewer Line and Related Structures Construction
PSCZ2JZ
Set-asideSmall Business (total)
PostedOct 28, 2026
Response deadlineNov 29, 2026 (2026-11-28T17:00:00-07:00)
Place of performanceID, 83638
Primary contactDerrick A Dodson · derrick.dodson@usda.gov

Description (excerpt)

A. This project consists of modifying an existing waterline and replacing a water hydrant, removing an existing wood deck and constructing a new metal deck, replacing the existing roof, abatement of lead-based paint, removing lead-based paint siding, installing new siding, and preparing and painting exterior surfaces of the New Meadows Range Barn located at the New Meadows Barracks administrative site located at 100 S Norris Ave. New Meadows, ID 83654. B. Base work includes the following described below: 1. Removal of existing roofing, installation of plywood sheathing over the existing skip sheathing, installation of ice/water shield over the entire roof, and installation of new corrugated metal roofing. 2. Abatement of lead-based paint of rafter tails, soffit, & fascia; and painting of aforementioned surfaces. 3. Removal of lead-based paint siding and felt paper, installation of plywood sheathing and building wrap, installation of new siding in-kind, installation of new trim in-kind around the windows, doors, and corners and painting of all aforementioned surfaces. 4. Replacement of approximately 10-feet of existing 1-inch SIDR 9 HDPE waterline including moving the existing hydrant location 2-feet to the east along the side of the building and replacement of the existing hydrant with a new hydrant and drainage basin. Additionally, replacement of an existing galvanized barb fitting with a brass barb fitting is required. C. Optional work includes the following described below: 1. Removal of existing wood decking and foundation piers and fabrication and installation of new expanded metal decking with steps over a metal frame with new foundation piers. D. Quantities associated with these options are identified in the Schedule of Items

View the official notice on SAM.gov →