Opportunities / VETERANS AFFAIRS, DEPARTMENT OF

Y1DZ--598-22-115 Site Utility Infrastructure-NLR

Notice typePresolicitation
Solicitation #36C25626R0084
DepartmentVETERANS AFFAIRS, DEPARTMENT OF
Sub-tier / officeVETERANS AFFAIRS, DEPARTMENT OF / 256-NETWORK CONTRACT OFFICE 16 (36C256)
NAICS237110 — Water and Sewer Line and Related Structures Construction
PSCY1DZ
Set-asideService-Disabled Veteran-Owned (SDVOSB)
PostedOct 26, 2026
Response deadlineNov 16, 2026 (2026-11-16T16:00:00-06:00)
Place of performanceNorth Little Rock, 72114
Primary contactJulius Jones · Julius.Jones@va.gov · 501-257-1044

Description (excerpt)

This procurement will be issued as a 100% Set-Aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB) through RFP procedures under FAR 15. The Central Arkansas Veterans Healthcare System (CAVHS) has a requirement Upgrade/Replace Site Utility Infrastructure, Project #598-22-115. The tentative date for issuing the RFP is on or around November 17, 2026, with proposals due approximately 49 calendar days later on or around January 05, 2027. There will be no public bid opening. The period of performance is 720 calendar days after issuance of the Notice to Proceed. Location of the work is at the Eugene J. Towbin (EJT) VA Healthcare Center, 2200 Fort Roots Drive, North Little Rock, AR 72114. The point of contact for this notice is Contract Specialist, Julius Jones at Julius.Jones@va.gov.Telephone requests will NOT be accepted. Abbreviated Scope of Work: The scope of this project includes upgrading the water source, storage, and site distribution system at the North Little Rock (NLR) Veterans Affairs Medical Center (VAMC) campus: All work shall be done is a manner and sequence to minimize impact to the campus, patients, visitors and staff. No prolonged outages are permitted and any activity affecting the campus shall be coordinated in advance. See additional sections for detailed information. The NLR campus is short of reserve water capacity. This project includes a new elevated water storage tank. The new tank installation shall include all labor and materials required for a complete and operational system including, but not limited to, supporting structure, piping, appurtenances, and accessories as required. The existing elevated 250,000-gallon water tower shall be demolished in its entirety including all below grade supporting structure, piping vaults, etc. The demolition shall be in strict accordance with the phasing schedule. A new pump house with new pumps and new pump controls is included in this project. Physical and operational security, monitoring, controls, redundancy and emergency power are included. The new pump house installation shall include all labor and materials required for a complete and operational system including, but not limited to, structure, fence, paving, piping, cameras, access control, emergency generator, appurtenances, and accessories as required. A new automated control system that interlocks to and also controls the existing south pump house as well as the new north pump house is included in this project. The new system  …